Throughout my travels, I frequently find myself fascinated with various types of railroad engineering. During my five years at Amtrak, I got the chance to observe quite a few distinctive machines devoted to the process of building railroad tracks. Particularly memorable were Portal-Krane 1, which maneuvered large pre-constructed switches into position during Penn Station Renewal, the catenary maintenance cars that lift technicians into position to service the wires on the Northeast Corridor, and the various rail grinders and welding machines used to replace Continuous Welded Rail (CWR). Closer to home but in a similar vein, Metro-North’s rail train has recently...

Hot fun, Late nights. Documenting Penn Station Renewal.

It may be hot, but down in the bowels of New York’s Pennsylvania Station it’s not really hell. Befitting the city’s well-known nickname, nobody here is sleeping at 2 AM – the renewal of Penn Station is a round-the-clock job. On the night of July 21st anticipation has been steadily building for the final placement of one of the many puzzle pieces of the station’s new track infrastructure. Switch 69B – everything is named numerically based on it’s position, with letters indicating the facing direction – is a massive piece of hardware that was assembled outside the station. In the...

Tuesday Tour of the New Haven Line: Devon Transfer

Giving Devon Transfer its own Tuesday Tour post may be a little bit of a joke, considering it is only a temporary station, nonetheless it is certainly worth a few minutes to check out. Intended to be in place for only six months, the transfer station facilitates passengers getting from the main New Haven Line over to the Waterbury Branch while Track 3 is currently out of service on the Devon Bridge for work. The v-shaped platform at Devon Transfer skirts the far end of the wye, allowing riders to essentially walk from the New Haven main line right over...

Spring Flowers and Harlem Line Track Work

After a very long and cold winter, it is finally starting to feel like spring. Hopefully you all had an enjoyable weekend, perhaps even watching or riding some trains. Alas down by the railroad tracks of the Hudson Line, the greenery has yet to bloom – so I decided to take spring to the trains.           Meanwhile, Metro-North crews were hard at work this weekend in numerous places around the system. On the upper Harlem Line, busing was in effect as crews worked at the Pleasant Ridge Road and Chippawalla Road crossings in Wingdale. The Pleasant Ridge crossing has...